Project Start Year: 2025
This project is one of 16 being carried out across South Wairarapa and Kapiti. It is needed to limit riverbank erosion upstream of and under the SH2 road bridge where it crosses the Waipoua River. It will also protect the existing walking track which runs alongside the river, and under the bridge. The aim is to safeguard the SH2 bridge from flood damage and enable public access along the riverbank footpath.
Benefits: Each project aims to deliver improved climate resilience and safety outcomes for the community, businesses , industry and infrastructure caused by repeated river flooding and erosion at an overall reduced cost to ratepayers.
Adaptation: Ecosystems and biodiversity will improve by providing more space for river channels. This will lead to a more diverse aquatic and riparian habitat, better connections between terrestrial and aquatic ecosystems and improved safety outcomes for nearby homes and facilities.
Resilience: Continued flood hazard management and erosion protection for land using sustainable management approaches enhance flood resilience in the area.
Collaboration: The work is co-funded by Greater Wellington and central government through Kānoa’s Regional Infrastructure Fund and provides the opportunity for mana whenua to be actively involved in decision-making and mātāwaka to be working on the ground, as well as upskilling and developing professionally.
Greater Wellington’s purpose is to enrich life in the Wellington region by building resilient, connected and prosperous communities, protecting and enhancing our natural assets and instilling pride in what makes us unique.